Conventional hydro: turbine and generator matching
The manufacturer separates Francis, axial-flow, tubular and impulse hydro unit families. Its hydro overview also names full-air, internal-water and evaporative cooling. These are alternatives chosen with head, flow, speed and generator layout; the site's 1000MW Francis maximum is portfolio evidence, not a rating that can be ordered for every river or head. A civil-and-hydraulic feasibility package must precede a motor or generator offer.
Confirm before ordering Share head-duration and flow curves, seasonal sediment and water chemistry, unit number, speed/grid frequency, powerhouse and crane envelope, cooling-water provision, transients and governor/protection requirements. Request hydraulic and generator guarantees for the exact proposed unit.
Pumped storage: one reversible operating envelope
The dedicated pumped-storage page publishes a 425MW portfolio maximum and a head range beginning at 86m; a broader hydro overview instead prints 108.2m as its lower bound. The two public ranges conflict, so neither can qualify a particular scheme by itself. Pump and generate modes, start/stop frequency, minimum head and grid services must be assessed in one matched reversible unit and controls package.
Confirm before ordering Provide upper/lower-reservoir operating levels, both-mode head and flow curves, start mode, ramp and cycling schedule, grid-code requirements and mechanical/civil limits. Ask the maker to reconcile the conflicting published lower-head boundaries for the specific bid.
Steam or gas turbine: select the cooling train
Harbin's separate turbine-generator overview lists product architectures including air-cooled, hydrogen-cooled and water-hydrogen-hydrogen machines across a broad 3–1300MW portfolio. Its nuclear half-speed and gas-turbine examples are distinct engineering programmes; group capacity does not establish the proposed generator's cooling, voltage or speed. Hydrogen, seal-oil and water auxiliaries can determine plant layout and safety obligations.
Confirm before ordering State prime-mover output and speed, operating profile, grid voltage and reactive-power range, cooling utilities, hydrogen/air or water train, shaft-line and transport envelope. Request generator and auxiliary-system boundaries on a single interface drawing.