Construction-hoist electric motor

Manufacturer catalogue image · Series illustration

Brake motors

Construction-hoist electric motor

Product Type
Construction-hoist electric motor
Catalogue Scope
Product family / configuration confirmed on inquiry
Power
Confirm configuration
Voltage
Confirm supply

Catalogue series · Exact configuration and availability confirmed by the manufacturer.

Open original manufacturer source ↗

CATALOGUE OVERVIEW

About this motor series

Construction-hoist electric motor from Qidong Datong.

The available catalogue identifies this series or component, but does not establish a complete orderable configuration here. Use the source reference and manufacturer name when requesting its specification sheet.

Published specifications

Use these ratings to shortlist the series. A range does not mean every combination is available.

Product Type
Construction-hoist electric motor
Catalogue Scope
Product family / configuration confirmed on inquiry
Power
Confirm configuration
Voltage
Confirm supply
Speed
Model dependent
Manufacturer
Qidong Datong

Request current pricing, MOQ, lead time and a dimensioned drawing for the exact configuration offered. Catalogue drawings may cover several variants.

Catalogue reference

Manufacturer
Qidong Datong
Product reference
Construction-hoist electric motor
Source reviewed
2026-09-21

Specifications describe the manufacturer’s published catalogue. They are not a test report or a guarantee that every option can be combined.

Read the manufacturer’s catalogue entry ↗
Selection guidance for Brake motors
  • Holding or stopping duty
  • Brake torque and response
  • Brake supply voltage
  • Manual release requirements
  • Load and stopping frequency
Compare this motor family →

Send a specification the manufacturer can quote

  1. Application and load: describe the machine, required torque or power, speed and operating cycle.
  2. Electrical supply: provide voltage, frequency, phase and any inverter or controller.
  3. Installation: share mounting, shaft dimensions, frame constraints and operating environment.
  4. Commercial requirements: state quantity, destination, target date and required certificates or drawings.
Read the complete RFQ checklist →

Share with your team

Keep your sourcing team on the same page.

LinkedInFacebookXWhatsAppEmail